Tianqu Aluminum Mould participated in the school construction project
What doesn't stump us will ultimately make us successful. Tianqu Aluminum Formwork never shies away from challenges, enabling the efficient use of aluminum formwork for complex and ever-changing structures. As the industry's first application of aluminum formwork in a school project, Tianqu Aluminum Formwork achieved efficient and high-quality construction.


As the industry's first public school project to utilize aluminum formwork, Tianqu Aluminum Formwork's professional aluminum formwork technology, experienced Jingxing team, and high-quality Jingxing products fully contributed to the project's high-quality completion. Combining two building types, office and dormitory, the complex structural changes, with zones 1 through 5 dispersed and distinct, with irregular variations between floors, Tianqu Aluminum Formwork's professional design and meticulous on-site management provided strong support for the project.
Aluminum formwork is a green and environmentally friendly prefabricated construction tool with high turnover and reusability. Its rigidity and hardness ensure optimal molding results, while also enabling a clear-water, plaster-free finish, reducing post-production investment.
Standard and custom-shaped structures. This project involved numerous special-shaped beams, floors, and wall columns. Jingxing Jianke custom-produced special-shaped panels based on project requirements.
Tianqu Aluminum Formwork, leveraging its professional and mature design expertise, completed the detailed and matched aluminum formwork. The project encompassed five zones, each with significant structural variations, requiring structural modifications and changes at every level. Tianqu Aluminum Formwork efficiently addressed a range of changes, including changes in wall beam size and position, high-support formwork, and joints. Refined design, differentiated change zones, and precise production improved on-site assembly efficiency, laying a solid foundation for project commencement.
The structural changes layer by layer, along with significant architectural layout variations, posed significant assembly challenges. We ensured simultaneous construction of zones 1-5. Aluminum formwork materials arrived on-site on time and in an orderly manner, separated from modified materials, and installed in separate zones. Tianqu Aluminum Formwork also provided technical guidance, ensuring accurate installation of modified zones, ensuring quality and quantity, and improving on-site construction efficiency. With numerous on-site changes, Tianqu Aluminum Formwork's staff flexibly utilized on-site formwork materials, matching the molds on-site according to the detailed drawings to address the changing areas.
Tianqu Aluminum Formwork's comprehensive and mature service system is well-suited to the challenges of complex structures. With practical experience accumulated from nearly a thousand projects, we can accomplish what others cannot. With professionalism, focus, and innovation, we're here to solve your problems!